BULK Time Lapse Video
Months of construction, I’ve been relatively lazy on posting the time lapse video we’ve been capturing at the space.
So here are several new videos ranging from constructing the new roof by the Mezzanine, the outdoor deck as part of the indoor/outdoor space, drywall going in, and structured wiring going in (with a lot of just movement around the space).
More to come as we pull our videos of the painting, windows, wood floors going in.
New Roof Construction
Deck Inside/Outside
Structured Wiring/Lots of Movement
Dry Wall Elevator/Bathroom
Thu, Oct 1, 2009
Construction