On the one month anniversary of our last post (!)…and just over a year since the first post (!!), perhaps one of the final construction posts. I’ve said this before, but the end is now, really, in sight. Perhaps 2 weeks even. Things got stalled for awhile as we had to figure out a solution […]
What a way to start the New Year….the heart and soul of the new space appeared yesterday. The team set up the foundation and frame for what is approx an eighteen foot bar (and “work” surface). Some of the old beams were used for the top frame. An illuminated panel will drop into the middle, […]
A quick update on things around the 301 King project. It's been two weeks of wiring, hvac and other prep work for the big changes coming.
Here’s some time lapse of the framing that was done for the new roof that will take over the area for the mezzanine. As previously discussed, the new roof gets framed in sections. Then the old roof is taken off, leaving us with a flat roof that opens up from the mezzanine level inside. Meanwhile […]
If you saw the "before" picture of the roofline from yesterday's post...here is today's "after" shot. Thanks to the massively talented builder team, all went smoothly.
A large steel beam is getting craned into place from the sky to help frame the new roof structure.
There are some basic principles that we’re looking to weave into this new office. They’re driven by a desire to create a different kind of space that reflects how we like to work and play. Most of the ideas were shaped by personal experience…lessons learned while working away in some great offices and some terrible […]
Wednesday, March 24, 2010
Comments Off on Final Push