Some pics of the progress being made in the entrance area…on the first floor and the top of the stairs to the second floor entry. This past week they’ve been digging a pit/foundation for the elevator and a support column. It’s deep. At the top of the stairs the view now opens up to the main entry of the office…as they pulled out a wall. This week calls for spraying Gunite (think pool concrete) on the back areas walls to give them some added strength.