Much to report, and getting very close to the wrap. Well, closer. Still some items on the to-do list but we can now see the light at the end of the hallway. Here are some things taking shape: Communal sink and stand – They did a great job on the cabinet/stand for the giant sink. […]
Two exciting happenings today. First, the new (old) treads for the mezzanine stairs are now in. The wood came from some of the old heart pine beams that came out…nice to reuse them and they look great. Second, the kitchen cabinets that Matt Decell and crew have been working on also arrived. They started installing […]
The other day the communal sink arrived. The thing is giant…a bit over 6 feet long…and was a burden to get upstairs. It will be mounted on a heavy wood frame, and we’ll add some river rocks in the bottom of it (for added weight?).
Months of construction, I’ve been relatively lazy on posting the time lapse video we’ve been capturing at the space. So here are several new videos ranging from constructing the new roof by the Mezzanine, the outdoor deck as part of the indoor/outdoor space, drywall going in, and structured wiring going in (with a lot of […]
Saturday, October 24, 2009
Comments Off on 301 Update – 10.24.09